Elevator door motor door motor Original three-phase asynchronous motor YVP90-6
Function:
Drive the elevator: Provide power for the elevator to rise and fall, drive the traction wheel through the rotation of the motor, and make the traction rope pull the car and counterweight device to realize the up and down movement of the elevator in the shaft to meet the vertical transportation needs of passengers or goods.
Precise speed control: It can accurately adjust the running speed of the elevator according to the running status and instructions of the elevator. At the start, it accelerates smoothly to the set speed; during the operation, it maintains a stable speed; when stopping at the floor, it accurately decelerates until it stops, ensuring the comfort and accuracy of the elevator operation.
Provide braking function: When the elevator needs to stop running or an abnormal situation occurs, the motor can quickly stop rotating through electromagnetic braking and other methods, so that the elevator can be reliably braked to prevent the elevator from sliding out of control or hitting the top, and ensure the safety of passengers and equipment.
Energy feedback and saving: Some advanced elevator motors have energy feedback function. During the deceleration or descent of the elevator, the mechanical energy generated by the motor is converted into electrical energy and fed back to the power grid to achieve energy recycling, reduce the energy consumption of the elevator, and achieve the purpose of energy saving and environmental protection.
Brand | SULAB |
Description | Elevator parts |
Model | YVP90-6 |
MOQ | 1PC |
Transportion | TNT, UPS, DHL, Fedex, Air, Sea |
Applicable | Elevator |
Packages | Carton, Wooden case, Pallet etc |
Delivery Time | Normally 2-3 working days after payment |
Warranty | One year |
Payment Method | Company Bank, Western union, alibaba, Paypal etc |
Preparation before installation
Check the motor: Check whether the model and specifications of the motor are consistent with the elevator configuration, whether the appearance is damaged, and whether all parts are complete.
Prepare tools and materials: Prepare the tools required for installation, such as wrenches, screwdrivers, electric drills, etc., as well as installation materials such as bolts, nuts, gaskets, and shock-absorbing pads.
Clean the installation site: Make sure the installation location is clean, dry, and free of debris to facilitate construction operations.