Send Message
Xian Sulab Machinery Co., Ltd. 86--15109261813 eric@elevator-spareparts.com
Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100

Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100

  • High Light

    STVF9 Service Diagnostic Test Tool

    ,

    Diagnostic Test Tool HHT-WB100

    ,

    Hyundai Elevator Test Tool

  • Model Number
    HHT-WB100
  • Product Name
    Hyunda Elevator STVF9 Service Tool HHT-WB100
  • Delivery Time
    2-3 Working Days
  • Supply Ability
    10000pcs Per Month
  • After-Sale Service
    Online Technical Support
  • Suitable For
    Elevator
  • Warranty
    One Year
  • Type
    Elevator Parts
  • Brand Name
    Hyunda
  • Minimum Order Quantity
    1 PC
  • Packaging Details
    Carton
  • Delivery Time
    1 working days
  • Payment Terms
    L/C, T/T, Western Union, MoneyGram, Paypal
  • Supply Ability
    10000pcs per month

Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100

Details for Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100

 

Brand Hyunda
Description Elevator Service Tool
Part No. HHT-WB100
MOQ 1PC
Transportion TNT, UPS, DHL, Fedex, Air, Sea
Applicable Elevator
Packages Carton, Wooden case, Pallet etc
Delivery Time Normally 2-3 working days after payment
Warranty One year
Payment Method Company Bank, Western union, alibaba, Paypal, Personal bank etc

 

Pictures for Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100

 

 

Hyundai Elevator STVF9 Service Diagnostic Test Tool HHT-WB100 0

 

 

Steps and methods of elevator debugging
 

1 . No-load simulation test
The scope of the no-load simulation test includes the control circuit of the elevator and the test operation of the traction machine without the car and the counterweight to check the correctness of the control program and the reliability of the traction machine. Before the no-load test run, the traction motor power line should be disconnected from the control cabinet, and only the control cabinet and its electrical circuit should be tested for a short time, and the electrical control program test should be carried out after confirming that everything is normal.