Xian Sulab Machinery Co., Ltd. 86--15109261813 sulaberic@parts-elevator.com
Elevator Accessories Escalator New Pulley Group Slewing Chain 18 Sections

Elevator Accessories Escalator New Pulley Group Slewing Chain 18 Sections

  • Highlight

    18 sections Slewing chain

    ,

    Elevator accessories Slewing chain

    ,

    escalator Slewing chain

  • Brand
    SULAB
  • Description
    Elevator Parts
  • Model
    Slewing Chain 18 Sections
  • MOQ
    1PC
  • Transportion
    TNT, UPS, DHL, Fedex, Air, Sea
  • Applicable
    Elevator
  • Packages
    Carton, Wooden Case, Pallet Etc
  • Delivery Time
    Normally 2-3 Working Days After Payment
  • Warranty
    One Year
  • Payment Method
    Company Bank, Western Union, Alibaba, Paypal Etc
  • Description
    Elevator Parts
  • Model
    FB-9B
  • Brand Name
    sulab
  • Model Number
    Slewing chain 18 sections
  • Minimum Order Quantity
    1 pcs
  • Payment Terms
    L/C,D/A,D/P,T/T,Western Union,MoneyGram

Elevator Accessories Escalator New Pulley Group Slewing Chain 18 Sections

Elevator accessories escalator new pulley group Slewing chain 18 sections


Preparation before installation
Inspect components: Ensure that the slewing chain and its related components, such as sprockets, chains, tensioners, etc., are not damaged, deformed or worn, and the surface should be smooth without burrs and flaws.
Clean the work area: Clean the debris, dust and oil stains in the escalator shaft and installation location to ensure a clean and tidy installation environment.
Prepare tools: Prepare the required installation tools, such as wrenches, screwdrivers, vernier calipers, dynamometers, etc.


Brand SULAB
Description Elevator  parts
Model Slewing chain 18 sections
MOQ 1PC
Transportion TNT, UPS, DHL, Fedex, Air, Sea
Applicable Elevator
Packages Carton, Wooden case, Pallet etc
Delivery Time Normally 2-3 working days after payment
Warranty One year
Payment Method Company Bank, Western union, alibaba, Paypal etc


Debugging and testing after installation
Manual turning: Before power-on operation, manually turn the drive wheel of the escalator to make the slewing chain drive the steps or pedals of the escalator to move slowly, and check whether the chain runs smoothly and whether there is any jamming, abnormal noise or abnormal resistance.
No-load test run: Turn on the power and let the escalator run a no-load test run. During the test run, closely observe the operation of the slewing chain, including the tension of the chain, the rotation of the sprocket, the working state of the guide device, etc. At the same time, check whether the running speed of the escalator is stable and whether there is any abnormal vibration or noise.
Load test: After the no-load test run is normal, perform a load test. Gradually increase the load of the escalator and observe the operation of the slewing chain under different load conditions. Pay attention to check whether the tension of the chain changes, whether the meshing of the sprocket and the chain is good, and whether the operation of the escalator is still stable and reliable.