Mitsubishi Elevator Modules PM200CLA120 PM300CLA120 PM150RSE120 – Original Parts In Stock

Brand Name: SULAB
Model Number: PM300CLA120
Minimum Order Quantity: 1
Delivery Time: 2-3 working days
Payment Terms: D/P,T/T
Inquiry Now
Get A Quote
Specifications
Highlight Features

Mitsubishi elevator module PM200CLA120

,

Mitsubishi elevator module PM300CLA120

,

Mitsubishi elevator module PM150RSE120

Description:
Elevator Module
Model:
PM300CLA120
Transportion:
TNT, UPS, DHL, Fedex, Air, Sea
Packages:
Carton, Wooden Case, Pallet Etc
Payment Method:
Company Bank, Western Union, Paypal Etc
Product Description
Mitsubishi Elevator Modules PM200CLA120 PM300CLA120 PM150RSE120 – Original Parts In Stock

Mitsubishi Elevator Modules PM200CLA120 PM300CLA120 PM150RSE120 - Original Parts In Stock

PM300CLA120 is Mitsubishi 6-in-1 three-phase intelligent power IPM module with rating of 1200V,300A. It integrates IGBT, gate driver chips, freewheeling diodes and temperature sensing circuit. Built-in protection functions include over-current, short-circuit, under-voltage and over-temperature, isolation voltage 2500VDC. With metal base plate for excellent heat dissipation, it is widely installed in Mitsubishi elevator traction inverter, converting DC power to three-phase AC to drive traction machine, acting as the core power component of elevator control cabinet.

Description Elevator module
Model PM300CLA120
Transportion TNT, UPS, DHL, Fedex, Air, Sea
Packages Carton, Wooden case, Pallet etc
Delivery Time Normally 2-3 working days after payment
Warranty One year
Payment Method Company Bank, Western union, Paypal etc

Installation & Maintenance Notes:

  • This module is a commonly used spare part for elevator maintenance
  • Damaged module causes inverter faults, elevator failure to start or sudden stop during operation
  • Fully cut off power and discharge capacitor residual voltage before replacement
  • Tighten mounting screws evenly and apply thermal grease properly to ensure good contact with heat sink
  • Verify model before purchasing replacement
  • Test drive circuit and perform no-load commissioning after installation to prevent secondary burnout
Related Products
Send An Inquiry